1. Field Instrumentation
Q2. Are more than 5% of field instrument measurements not connected to a control room or centralized monitoring location?
Q13. Is an Instrument Asset Management System (IAMS) in use?
Q16. Is a wireless instrumentation network in place?
2. Process Alarm Management
Q22. Is there an approved alarm register containing, at minimum, tag number, description, units, instrument range, alarm limits, alarm priority and operator response information?
Q25. Has an alarm-management philosophy been developed and have the alarms been rationalized?
Q27. Is an alarm-management system implemented in alignment with an applicable recognized standard, such as ISA-18.2 or EEMUA 191?
3. Basic Process Control System (BPCS) Performance
Q39. Have priority Basic Process Control System (BPCS) loops been identified, including their limits, setpoints and operating modes, in accordance with the approved site standard?
Q44. How often are controllers checked for tuning adequacy?
Q45. How is process-control loop performance rated in terms of operation in the correct mode?
4. Safety Instrumented Systems (SIS)
Q48. What is the status of Layer of Protection Analysis (LOPA) for applicable process hazards?
Q50. Is an approved Safety Requirements Specification (SRS) available for the facility's Safety Instrumented System (SIS)?
Q55. Have identified SIS gaps been analyzed, risk-ranked and assigned corrective actions?
5. Advanced Process Control (APC)
Q60. To what level are cause-and-effect relationships between key process variables documented for operator training and troubleshooting?
Q70. Is Model Predictive Control (MPC) in use?
6. Process Modelling and Real-Time Optimization (RTO)
Q74. How is the plant currently modelled for performance analysis?
Q77. Is Real-Time Optimization (RTO) implemented in the facility?
7. Control System Upgrade and Lifecycle Management
Q80. How many control rooms operate within the facility?
Q91. When was the control system last substantially upgraded?
8. Manufacturing Execution and Production Information Systems
Q94. Is a process data historian or operational data platform available for the facility?
Q97. What is the Manufacturing Execution System (MES) or equivalent production-information capability currently used for?
Q98. Has a Production Management System (PMS) or Manufacturing Execution System (MES) capability assessment been completed for the facility?
9. Engineering and Control System Documentation
Q105. What is the status of core process documents such as the Process Design Basis, process flow diagrams, piping and instrumentation diagrams, control narratives and OEM manuals?
10. Technical Training and Capability
Q112. Who carries out DCS and PLC maintenance functions?
Q128. Is a structured control-room operator training and competency program in place?
Summary